![1 SISAV 1 SISAV](https://www.est.pt/wp-content/uploads/2023/09/1-SISAV-835x578.jpg)
Installation of new plant
. Industrial Electricity
. Waste
. Portugal
![1 SISAV 1 SISAV](https://www.est.pt/wp-content/uploads/2023/09/1-SISAV-835x578.jpg)
![2 SISAV 2 SISAV](https://www.est.pt/wp-content/uploads/2023/09/2-SISAV-835x578.jpg)
![3 SISAV 3 SISAV](https://www.est.pt/wp-content/uploads/2023/09/3-SISAV-835x578.jpg)
![4 SISAV 4 SISAV](https://www.est.pt/wp-content/uploads/2023/09/4-SISAV-835x578.jpg)
![5 SISAV 5 SISAV](https://www.est.pt/wp-content/uploads/2023/09/5-SISAV-835x578.jpg)
![7 SISAV 7 SISAV](https://www.est.pt/wp-content/uploads/2023/09/7-SISAV-835x578.jpg)
![8 SISAV 8 SISAV](https://www.est.pt/wp-content/uploads/2023/09/8-SISAV-835x578.jpg)
![9 SISAV 9 SISAV](https://www.est.pt/wp-content/uploads/2023/09/9-SISAV-835x578.jpg)
Project Solution
Following the need to treat industrial waste produced in Portugal, which had previously been exported for treatment in other European countries, SISAV set out to build a treatment center.
We were therefore challenged with the electrical installation of the building. The creation of this plant was an important milestone in the principle of self-sufficiency and proximity in the treatment of hazardous industrial waste in Portugal.