Supply of electrical boards for refurbishing Steyler Hotel - Fátima

Partial refurbishment of the hotel which includes the renovation of 70 rooms, each equipped with an electrical board. In a total of 93 boards for power distribution in the hotel.

All cabinets and cutting and protective equipment are from the ABB brand; • Energy analyser with WebServer function installed on QE, which includes HTML pages that allow direct access via a standard Web page (Internet Explorer, Firefox, Chrome ...).

The remaining energy analysers installed in the partial boards, connected to the main network analyser over a serial communication on RS-485.

Solution that allows monitoring different electrical parameters of different electrical boards in centralised solution.